Skip to content
No results
  • Products
    • Amphibious pumps
    • Submersible pumps
    • Turbogenerators
    • Aerators
  • Solutions
    • EcoStart
    • Irrigated Agriculture
    • Turbogenerators
    • Urban drainage
  • Projects
  • Customer Service
    • Support
    • Spare Parts
    • Telemetry
    • Qualification
    • Technical Assistant
    • Ombudsman
  • Who we are
  • Contact
  • Blog

  • Portuguese (Brazil)
  • English

Logo HIGRA 25 AnosLogo HIGRA 25 Anos
  • Products
    • Amphibious pumps
    • Submersible pumps
    • Turbogenerators
    • Aerators
  • Solutions
    • EcoStart
    • Irrigated Agriculture
    • Turbogenerators
    • Urban drainage
  • Projects
  • Customer Service
    • Support
    • Spare Parts
    • Telemetry
    • Qualification
    • Technical Assistant
    • Ombudsman
  • Who we are
  • Contact
  • Blog

  • Portuguese (Brazil)
  • English

Logo HIGRA 25 AnosLogo HIGRA 25 Anos

Water Transfer | Vertical Shaft Replacement

Gerdau is one of the main customers using HIGRA equipment for river water collection, industrial water circulation and processes in general. Simple installation, low noise levels, high hydro-energy efficiency and reduced civil works are among the advantages offered by the pumps, as the company’s directors emphasize. “Industry is looking for energy reduction and we have excellent results. At Gerdau, for example, in the rolling mill sector we achieved a very quick return on investment with a significant reduction in installed power compared to the previous equipment.”

Case Hydro-Energy Efficiency: Gerdau

Cosigua

Hydro-Energy Efficiency

Old Scenario

– SULZER Vertical Shaft Pump
– Motor power 125 HP (92kW)
– Total pump flow 1,200m³/h (333 l/s)
– 05 pumps: 6.000m³/h
– Installed power: 625 HP (460Kw)
– Pumping pressure of 10mca
– Hydro-energy index of 0.077 kW/m³/h
– Monthly electricity cost R$ 49,680.00 (R$ 0.15 kWh)
– Annual electricity cost R$ 596,160.00

Current Scenario

– HIGRA M1-305/100B amphibious pump
– Motor power 100CV (73.6W)
– Flow rate per pump 1,200m³/h (333 l/s)
– 05 pumps: 6.000m³/h
– Installed power: 500 HP
– Pumping pressure of 10mca
– Hydro-energy index of 0.061 kW/m³/h
– Monthly electricity cost R$ 39,744.00 (R$ 0.15 kWh)
– Annual electricity cost R$ 476,928.00

Results

– Reduction of power 125 HP
– Hydro-energy gain of 25%
– Investment required R$ 375,000.00
– Monthly savings of R$ 9,936.00
– Annual savings of R$ 119,232.00
– Return on investment in 3.15 years

Outros projetos

Replacement of vertical shaft pumps with amphibious pumps

Sobradinho Dam Irrigation Canal – DINC

Water collection | Irrigation

Subscribe to our newsletter
Receive all the latest news from HIGRA in your e-mail inbox.

Address

Rua Dilceu Elias de Moura 345
Arroio da Manteiga
São Leopoldo/RS – Brazil
ZIP code: 93135-390
Telephone: +55 51 3778-2929
E-mail: contato@higra.com.br

Products
  • Amphibious pumps
  • Submersible pumps
  • Aerators
  • Turbogenerators
  • Amphibious pumps
  • Submersible pumps
  • Aerators
  • Turbogenerators
About
  • Who we are
  • Contact
  • Privacy Policy
  • Reporting Channel
  • Data manager
  • Who we are
  • Contact
  • Privacy Policy
  • Reporting Channel
  • Data manager
Logo 25 Anos-branco

We are a company passionate about solving problems in a sustainable way. Through our disruptive technologies, we seek to make the world a better place to live.

“The future doesn’t belong to us, but making it better is part of our present.”

HIGRA Innovation and Sustainability © 2025. All rights reserved.

Instagram Facebook Linkedin Youtube Whatsapp