{"id":24863,"date":"2022-09-03T15:07:24","date_gmt":"2022-09-03T18:07:24","guid":{"rendered":"https:\/\/higra.com.br\/projetos\/water-transfer-vertical-shaft-replacement\/"},"modified":"2025-06-27T13:24:29","modified_gmt":"2025-06-27T16:24:29","slug":"water-transfer-vertical-shaft-replacement","status":"publish","type":"projetos","link":"https:\/\/higra.com.br\/en\/projetos\/water-transfer-vertical-shaft-replacement\/","title":{"rendered":"Water Transfer | Vertical Shaft Replacement"},"content":{"rendered":"\n<p>Gerdau is one of the main customers using HIGRA equipment for river water collection, industrial water circulation and processes in general. Simple installation, low noise levels, high hydro-energy efficiency and reduced civil works are among the advantages offered by the pumps, as the company&#8217;s directors emphasize. &#8220;Industry is looking for energy reduction and we have excellent results. At Gerdau, for example, in the rolling mill sector we achieved a very quick return on investment with a significant reduction in installed power compared to the previous equipment.&#8221;  <\/p>\n\n<p>Case Hydro-Energy Efficiency: Gerdau<\/p>\n\n<p>Cosigua<\/p>\n\n<p>Hydro-Energy Efficiency<\/p>\n\n<p>Old Scenario<\/p>\n\n<p>&#8211; SULZER Vertical Shaft Pump<br\/>&#8211; Motor power 125 HP (92kW)<br\/>&#8211; Total pump flow 1,200m\u00b3\/h (333 l\/s)<br\/>&#8211; 05 pumps: 6.000m\u00b3\/h<br\/>&#8211; Installed power: 625 HP (460Kw)<br\/>&#8211; Pumping pressure of 10mca<br\/>&#8211; Hydro-energy index of 0.077 kW\/m\u00b3\/h<br\/>&#8211; Monthly electricity cost R$ 49,680.00 (R$ 0.15 kWh)<br\/>&#8211; Annual electricity cost R$ 596,160.00<\/p>\n\n<p>Current Scenario<\/p>\n\n<p>&#8211; HIGRA M1-305\/100B amphibious pump<br\/>&#8211; Motor power 100CV (73.6W)<br\/>&#8211; Flow rate per pump 1,200m\u00b3\/h (333 l\/s)<br\/>&#8211; 05 pumps: 6.000m\u00b3\/h<br\/>&#8211; Installed power: 500 HP<br\/>&#8211; Pumping pressure of 10mca<br\/>&#8211; Hydro-energy index of 0.061 kW\/m\u00b3\/h<br\/>&#8211; Monthly electricity cost R$ 39,744.00 (R$ 0.15 kWh)<br\/>&#8211; Annual electricity cost R$ 476,928.00<\/p>\n\n<p>Results<\/p>\n\n<p>&#8211; Reduction of power 125 HP<br\/>&#8211; Hydro-energy gain of 25%<br\/>&#8211; Investment required R$ 375,000.00<br\/>&#8211; Monthly savings of R$ 9,936.00<br\/>&#8211; Annual savings of R$ 119,232.00<br\/>&#8211; Return on investment in 3.15 years<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gerdau is one of the main customers using HIGRA equipment for river water collection, industrial water circulation and processes in general. Simple installation, low noise levels, high hydro-energy efficiency and reduced civil works are among the advantages offered by the pumps, as the company&#8217;s directors emphasize. &#8220;Industry is looking for energy reduction and we have [&hellip;]<\/p>\n","protected":false},"featured_media":8273,"template":"","meta":[],"tags":[],"class_list":["post-24863","projetos","type-projetos","status-publish","has-post-thumbnail","hentry","projeto-bombas-anfibias"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/projetos\/24863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/projetos"}],"about":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/types\/projetos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/media\/8273"}],"wp:attachment":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/media?parent=24863"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/tags?post=24863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}