{"id":24852,"date":"2022-09-03T16:01:41","date_gmt":"2022-09-03T19:01:41","guid":{"rendered":"https:\/\/higra.com.br\/projetos\/sobradinho-dam-irrigation-canal-dinc\/"},"modified":"2025-06-27T15:12:42","modified_gmt":"2025-06-27T18:12:42","slug":"sobradinho-dam-irrigation-canal-dinc","status":"publish","type":"projetos","link":"https:\/\/higra.com.br\/en\/projetos\/sobradinho-dam-irrigation-canal-dinc\/","title":{"rendered":"Sobradinho Dam Irrigation Canal &#8211; DINC"},"content":{"rendered":"\n<p><strong>Sobradinho Dam Irrigation Canal &#8211; DINC<\/strong><\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Challenge:<\/strong> To deliver in record time of four months a complete system for pumping water from the bed of the Sobradinho Dam transposition canal directly to the Nilo Coelho Irrigation District, which was being impacted by the drought. Delivery time requested on an emergency basis after the start of the work for three months. <\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Solution:<\/strong> Produce and install a set of 10 motor pumps, 225 auxiliary floats and install the site&#8217;s electrical system.<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Operation:<\/strong> Project divided into two sites:<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>S\u00e3o Leopoldo (RS)<\/strong>: Engineering* and Production of the motor pumps.<br>*Engineering used <strong>Ansys CFX<\/strong> software, a program used to solve large-scale fluid flow problems.<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Petrolina (PE):<\/strong> construction of the floats and manufacture of the electrical components for the power generators and monitoring the production of the pipes and earthworks for the construction of the canal at the dam.<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>DEADLINES:<br><\/strong><br> Start of work: October 2015<br>Official delivery deadline: January 26, 2016<br>Emergency deadline requested: December 28<br>Completed and inaugurated: December 18<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Investment: R$13.4 million + R$12.7 million for the compact soil canal inside the lake.<br>The DINC comprises 23,000 hectares of irrigable area stretching from the municipality of Casa Nova (north of Bahia) to Petrolina (southwest of Pernambuco), with 20% of the area in the state of Bahia and 80% in Pernambuco.<\/p>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>More than 2,300 farmers benefited, including small users and medium and large companies.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sobradinho Dam Irrigation Canal &#8211; DINC Challenge: To deliver in record time of four months a complete system for pumping water from the bed of the Sobradinho Dam transposition canal directly to the Nilo Coelho Irrigation District, which was being impacted by the drought. Delivery time requested on an emergency basis after the start of [&hellip;]<\/p>\n","protected":false},"featured_media":8426,"template":"","meta":[],"tags":[],"class_list":["post-24852","projetos","type-projetos","status-publish","has-post-thumbnail","hentry","projeto-bombas-anfibias"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/projetos\/24852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/projetos"}],"about":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/types\/projetos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/media\/8426"}],"wp:attachment":[{"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/media?parent=24852"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/higra.com.br\/en\/wp-json\/wp\/v2\/tags?post=24852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}